<div dir="ltr">Here is some info from WADot:<div><ul style="color:rgb(0,0,0);font-family:Lato,Verdana,Arial,Helvetica,sans-serif;font-size:11.04px"><li style="line-height:1.5em;font-size:1.2em">Paving work is scheduled to begin on Monday, July 26. </li><li style="line-height:1.5em;font-size:1.2em">Construction work will require a full weekend closure of the Washington Street and Main Street intersections with Mill Plain Boulevard scheduled to begin at 10 p.m. Friday June 18 and reopen no later than 4 a.m. Monday June 20. We are coordinating this construction work in close coordination with the City of Vancouver which also has construction happening downtown. </li></ul><div><font color="#000000" face="Lato, Verdana, Arial, Helvetica, sans-serif"><span style="font-size:13.248px">I have not seen any info from C-tran on how the buses will be detouring around the closures in June or paving in July.</span></font></div><div><font color="#000000" face="Lato, Verdana, Arial, Helvetica, sans-serif"><span style="font-size:13.248px"><br></span></font></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><font face="comic sans ms,sans-serif">Beth Greenberg</font></div></div></div></div></div></div>